Columbia falls under zone 3A
Richland County runs hot and humid for most of the year, with a winter that stays mild and short. A heat pump going in here has to hold up to months of heavy cooling, not a hard freeze it will rarely see.
Takes about a minute. No obligation.
Richland County runs hot and humid for most of the year, with a winter that stays mild and short. A heat pump going in here has to hold up to months of heavy cooling, not a hard freeze it will rarely see.
Heat pumps installed here now need to hit at least 14.3 SEER2 for cooling and 7.5 HSPF2 for heating. Central air systems under 45,000 Btu/h face that same 14.3 SEER2 floor, higher than what the rest of the country requires. That rules out lower-efficiency units some installers might otherwise offer.

NOAA nClimDiv, 1991–2020 normals
Electricity heats 73.4% of homes in Richland County.
A heat pump replacing an electric furnace or baseboard heat swaps one electric system for another, with no gas line or propane tank to work around.



Cooling runs here from May through September, so April is the month to get a new heat pump in place before the heat starts. Heat is shorter, November through March, with October as the month to beat on that side. Wait until the first hot stretch or the first cold night and you're choosing from whatever unit a contractor can get fastest, not the one that fits your home. Installing in April or October also gives the system a stretch of mild weather to run in before it has to work hard, so a problem shows up while it's still easy to deal with.
A new system here has to meet this region's minimum efficiency, which limits what can go in.
Find a contractorWhoever installs the new heat pump has to deal with the old one first. If it's a heat pump or an air conditioner, the refrigerant inside has to be recovered before anything gets disconnected, since it can't just be vented into the air. A contractor pulls it out with a recovery machine and stores it properly before the lines get cut. Once that's done, the outdoor unit, the indoor coil and the old line set usually come out together, and the pad or mounting bracket gets cleared for the new equipment. If the system being replaced is a furnace paired with an air handler, the ductwork connections often stay put, and only get modified if the new coil needs different airflow than the old one. The thermostat almost never carries over. A heat pump needs one built to run its compressor stages the way the system was designed, and an old thermostat wired for a furnace won't do that.
A heat pump has to be sized to the house, not just swapped in at the same tonnage as whatever was there before. That takes a load calculation, room by room, looking at window area, ceiling height and insulation. Skip that step and you either pay for capacity the house doesn't need or end up with a unit that short cycles and never dehumidifies right. The sizing work shapes which equipment fits, and that's most of what sets the price.
If the existing ducts were sized for a furnace and a separate AC coil, they may not move enough air for a heat pump running in heating mode, since heat pumps push air that's cooler than furnace heat and need more of it to keep a room comfortable. A contractor has to check static pressure and duct size before committing to equipment, and if the ducts need rework, that's added labor beyond the unit itself.
The SEER2 and HSPF2 numbers on the label come from a lab test. Refrigerant charge held exactly right, ducts assumed to move exactly enough air. That's the ceiling for what the unit can do, not a promise of what it will do in your house. A unit rated well above the minimum can still run worse than its label if the charge is off or the ducts choke it down. What closes that gap is the installation. Correct charge, ducts sized to move enough air, a thermostat set up for how the compressor actually stages its heat. Skip any of that and the rating on the label stops meaning much.
The old equipment has to come fully apart before the new unit goes in, so installation day runs long. The outdoor unit goes on the pad first and gets leveled, since a heat pump sitting crooked puts uneven strain on the compressor mounts over time. Line sets get run or reused, then pressure tested before any refrigerant goes in, because a leak found after charging means undoing work that was already finished. Charging comes next, and it has to be weighed in or checked against the manufacturer's chart for the line length, not just filled until a gauge looks right. Once the system has charge, a contractor runs it through both heating and cooling, checking airflow at the vents and making sure the thermostat is actually staging the compressor the way it was designed to. None of that shows up on the label, but all of it decides whether the unit runs the way the label says it should.
